US Bridges

I-95 (SR-9) over Jtb (SR-202)

Good

Duval County, Florida · I-95 over Jtb · Structure no. 720814

Built
2016
9 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
171 ft
2 main spans
Daily traffic
118,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 (SR-9) over Jtb (SR-202) is a prestressed concrete stringer/multi-beam or girder carrying I-95 (SR-9) over Jtb (SR-202) in Duval County, Florida. It was built in 2016, so it is 9 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 118,500 vehicles a day, roughly 13% of them trucks, projected to reach 205,598 by 2045. The structure is 171 ft (52.2 m) long and 153 ft wide.

CarriesI-95 (SR-9)
CrossesJtb (SR-202)
LocationI-95 over Jtb
RouteInterstate 95
StateFlorida
Coordinates30.24847, -81.59342
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.9 US tons
Inventory rating40.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length171 ft (52.2 m)
Longest span129 ft (39.2 m)
Deck width153 ft (46.7 m)
Roadway width148 ft (45.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic118,500 (2023)
Projected traffic205,598 by 2045
Trucks13%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 (SR-9) over Jtb (SR-202) built?

It was built in 2016, making it 9 years old in 2025.

What condition is I-95 (SR-9) over Jtb (SR-202) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does I-95 (SR-9) over Jtb (SR-202) carry?

About 118,500 vehicles per day (2023 count), of which roughly 13% are trucks.

How long is I-95 (SR-9) over Jtb (SR-202)?

The structure is 171 ft (52.2 m) long with a longest span of 129 ft (39.2 m) and a deck 153 ft wide.

Who owns I-95 (SR-9) over Jtb (SR-202)?

It is owned by the State Highway Agency.