US Bridges

I-95 SB Ramp/ US-1 over Atlantic Blvd.

Good

Duval County, Florida · I-95 SB /Atlantic/Ramp Q · Structure no. 720787

Built
2017
8 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
1 main span
Daily traffic
8,700
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 SB Ramp/ US-1 over Atlantic Blvd. is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB Ramp/ US-1 over Atlantic Blvd. in Duval County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,700 vehicles a day, roughly 7% of them trucks, projected to reach 15,051 by 2042. The structure is 150 ft (45.8 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-95 SB Ramp/ US-1
CrossesAtlantic Blvd.
LocationI-95 SB /Atlantic/Ramp Q
RouteInterstate 95
StateFlorida
Coordinates30.30804, -81.64661
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.5 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length150 ft (45.8 m)
Longest span150 ft (45.8 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,700 (2022)
Projected traffic15,051 by 2042
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 SB Ramp/ US-1 over Atlantic Blvd. built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-95 SB Ramp/ US-1 over Atlantic Blvd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I-95 SB Ramp/ US-1 over Atlantic Blvd. carry?

About 8,700 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is I-95 SB Ramp/ US-1 over Atlantic Blvd.?

The structure is 150 ft (45.8 m) long with a longest span of 150 ft (45.8 m) and a deck 30 ft wide.

Who owns I-95 SB Ramp/ US-1 over Atlantic Blvd.?

It is owned by the State Highway Agency.