US Bridges

SR-201 NB over Csxrr

Good

Duval County, Florida · 0.25 Mile S. of US-90 · Structure no. 720780

Built
2019
6 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
256 ft
3 main spans
Daily traffic
2,300
2023 count
Owner
State
State Highway Agency

About this bridge

SR-201 NB over Csxrr is a prestressed concrete stringer/multi-beam or girder carrying SR-201 NB over Csxrr in Duval County, Florida. It was built in 2019, so it is 6 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,300 vehicles a day, roughly 30% of them trucks, projected to reach 3,991 by 2045. The structure is 256 ft (78 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-201 NB
CrossesCsxrr
Location0.25 Mile S. of US-90
RouteState Highway 201
StateFlorida
Coordinates30.29893, -81.98904
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.2 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length256 ft (78 m)
Longest span116 ft (35.4 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,300 (2023)
Projected traffic3,991 by 2045
Trucks30%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-201 NB over Csxrr built?

It was built in 2019, making it 6 years old in 2025.

What condition is SR-201 NB over Csxrr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR-201 NB over Csxrr carry?

About 2,300 vehicles per day (2023 count), of which roughly 30% are trucks.

How long is SR-201 NB over Csxrr?

The structure is 256 ft (78 m) long with a longest span of 116 ft (35.4 m) and a deck 43 ft wide.

Who owns SR-201 NB over Csxrr?

It is owned by the State Highway Agency.