I-295 (SR-9A) over Drainage Ditch
PoorDuval County, Florida · 0.1 Mile S. of Saints Rd. · Structure no. 720735
- Built
- 2004
- 21 years old
- Condition
- Poor
- inspected February 2025
- Type
- Culvert
- Concrete
- Length
- 21 ft
- 2 main spans
- Daily traffic
- 100,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-295 (SR-9A) over Drainage Ditch is a concrete culvert carrying I-295 (SR-9A) over Drainage Ditch in Duval County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 100,000 vehicles a day, roughly 13% of them trucks, projected to reach 173,500 by 2045. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-295 (SR-9A) over Drainage Ditch built?
It was built in 2004, making it 21 years old in 2025.
What condition is I-295 (SR-9A) over Drainage Ditch in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2025.
How much traffic does I-295 (SR-9A) over Drainage Ditch carry?
About 100,000 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is I-295 (SR-9A) over Drainage Ditch?
The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m).
Who owns I-295 (SR-9A) over Drainage Ditch?
It is owned by the State Highway Agency.