US Bridges

SR-13 Acosta Leg C over Vacant Lot

Good

Duval County, Florida · SR-13 SB to Prudential DR · Structure no. 720574

Built
1991
34 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
479 ft
5 main spans
Daily traffic
5,061
2024 count
Owner
State
State Highway Agency

About this bridge

SR-13 Acosta Leg C over Vacant Lot is a steel continuous stringer/multi-beam or girder carrying SR-13 Acosta Leg C over Vacant Lot in Duval County, Florida. It was built in 1991, so it is 34 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,061 vehicles a day, roughly 2% of them trucks, projected to reach 8,781 by 2046. The structure is 479 ft (146 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR-13 Acosta Leg C
CrossesVacant Lot
LocationSR-13 SB to Prudential DR
RouteState Highway 13
StateFlorida
Coordinates30.31806, -81.66222
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating33.8 US tons
Inventory rating25.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length479 ft (146 m)
Longest span105 ft (32 m)
Deck width35 ft (10.8 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,061 (2024)
Projected traffic8,781 by 2046
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-13 Acosta Leg C over Vacant Lot built?

It was built in 1991, making it 34 years old in 2025.

What condition is SR-13 Acosta Leg C over Vacant Lot in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR-13 Acosta Leg C over Vacant Lot carry?

About 5,061 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is SR-13 Acosta Leg C over Vacant Lot?

The structure is 479 ft (146 m) long with a longest span of 105 ft (32 m) and a deck 35 ft wide.

Who owns SR-13 Acosta Leg C over Vacant Lot?

It is owned by the State Highway Agency.