US Bridges

I-295 NB (SR-9A) over Lost Pine Drive

Good

Duval County, Florida · I-295 Nb/Lost Pine Dr. · Structure no. 720562

Built
2004
21 years old
Condition
Good
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
117 ft
1 main span
Daily traffic
47,750
2023 count
Owner
State
State Highway Agency

About this bridge

I-295 NB (SR-9A) over Lost Pine Drive is a prestressed concrete stringer/multi-beam or girder carrying I-295 NB (SR-9A) over Lost Pine Drive in Duval County, Florida. It was built in 2004, so it is 21 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 47,750 vehicles a day, roughly 13% of them trucks, projected to reach 82,846 by 2045. The structure is 117 ft (35.7 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-295 NB (SR-9A)
CrossesLost Pine Drive
LocationI-295 Nb/Lost Pine Dr.
RouteInterstate 295
StateFlorida
Coordinates30.30889, -81.52361
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.2 US tons
Inventory rating54.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length117 ft (35.7 m)
Longest span117 ft (35.7 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic47,750 (2023)
Projected traffic82,846 by 2045
Trucks13%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-295 NB (SR-9A) over Lost Pine Drive built?

It was built in 2004, making it 21 years old in 2025.

What condition is I-295 NB (SR-9A) over Lost Pine Drive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does I-295 NB (SR-9A) over Lost Pine Drive carry?

About 47,750 vehicles per day (2023 count), of which roughly 13% are trucks.

How long is I-295 NB (SR-9A) over Lost Pine Drive?

The structure is 117 ft (35.7 m) long with a longest span of 117 ft (35.7 m) and a deck 43 ft wide.

Who owns I-295 NB (SR-9A) over Lost Pine Drive?

It is owned by the State Highway Agency.