US Bridges

I-295 (SR-9A) over Cedar Creek

Fair

Duval County, Florida · 1.5 Mi. N. of SR-115 · Structure no. 720463

Built
1976
49 years old
Condition
Fair
inspected August 2024
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
68,000
2023 count
Owner
State
State Highway Agency

About this bridge

I-295 (SR-9A) over Cedar Creek is a concrete culvert carrying I-295 (SR-9A) over Cedar Creek in Duval County, Florida. It was built in 1976, so it is 49 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 68,000 vehicles a day, roughly 13% of them trucks, projected to reach 117,980 by 2045. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesI-295 (SR-9A)
CrossesCedar Creek
Location1.5 Mi. N. of SR-115
RouteInterstate 295
StateFlorida
Coordinates30.46, -81.68167
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating41.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length33 ft (10.1 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic68,000 (2023)
Projected traffic117,980 by 2045
Trucks13%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-295 (SR-9A) over Cedar Creek built?

It was built in 1976, making it 49 years old in 2025.

What condition is I-295 (SR-9A) over Cedar Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does I-295 (SR-9A) over Cedar Creek carry?

About 68,000 vehicles per day (2023 count), of which roughly 13% are trucks.

How long is I-295 (SR-9A) over Cedar Creek?

The structure is 33 ft (10.1 m) long with a longest span of 9 ft (2.7 m).

Who owns I-295 (SR-9A) over Cedar Creek?

It is owned by the State Highway Agency.