US Bridges

SR-202 (jtb) over Equipment Underpass

Good

Duval County, Florida · 2 Mi.E.Of St. Johns Bluff · Structure no. 720459

Built
1979
46 years old, rebuilt 2009
Condition
Good
inspected June 2023
Type
Slab
Concrete
Length
33 ft
1 main span
Daily traffic
127,000
2022 count
Owner
State
State Highway Agency

About this bridge

SR-202 (jtb) over Equipment Underpass is a concrete slab carrying SR-202 (jtb) over Equipment Underpass in Duval County, Florida. It was built in 1979 and reconstructed in 2009, so it is 46 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 127,000 vehicles a day, roughly 4% of them trucks, projected to reach 220,345 by 2044. The structure is 33 ft (10.1 m) long and 123 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesSR-202 (jtb)
CrossesEquipment Underpass
Location2 Mi.E.Of St. Johns Bluff
RouteState Highway 202
StateFlorida
Coordinates30.25124, -81.48408
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating37.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span32 ft (9.8 m)
Deck width123 ft (37.5 m)
Roadway width118 ft (36 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic127,000 (2022)
Projected traffic220,345 by 2044
Trucks4%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-202 (jtb) over Equipment Underpass built?

It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2009.

What condition is SR-202 (jtb) over Equipment Underpass in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR-202 (jtb) over Equipment Underpass carry?

About 127,000 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is SR-202 (jtb) over Equipment Underpass?

The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 123 ft wide.

Who owns SR-202 (jtb) over Equipment Underpass?

It is owned by the State Highway Agency.