US Bridges

I-295 (SR-9A) over Six Mile Creek

Fair

Duval County, Florida · 0.3 Mi. S. of Pritchard R · Structure no. 720441

Built
1976
49 years old, rebuilt 2003
Condition
Fair
inspected June 2024
Type
Culvert
Concrete
Length
44 ft
3 main spans
Daily traffic
79,544
2023 count
Owner
State
State Highway Agency

About this bridge

I-295 (SR-9A) over Six Mile Creek is a concrete culvert carrying I-295 (SR-9A) over Six Mile Creek in Duval County, Florida. It was built in 1976 and reconstructed in 2003, so it is 49 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 79,544 vehicles a day, roughly 16% of them trucks, projected to reach 138,009 by 2025. The structure is 44 ft (13.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-295 (SR-9A)
CrossesSix Mile Creek
Location0.3 Mi. S. of Pritchard R
RouteInterstate 295
StateFlorida
Coordinates30.36596, -81.76097
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating59.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length44 ft (13.4 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic79,544 (2023)
Projected traffic138,009 by 2025
Trucks16%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-295 (SR-9A) over Six Mile Creek built?

It was built in 1976, making it 49 years old in 2025. It was reconstructed in 2003.

What condition is I-295 (SR-9A) over Six Mile Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I-295 (SR-9A) over Six Mile Creek carry?

About 79,544 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is I-295 (SR-9A) over Six Mile Creek?

The structure is 44 ft (13.4 m) long with a longest span of 12 ft (3.7 m).

Who owns I-295 (SR-9A) over Six Mile Creek?

It is owned by the State Highway Agency.