US Bridges

I-295 SB (SR-9A) over Wheat Rd.

Good

Duval County, Florida · 0.5 Mi. S. of 103rd St. · Structure no. 720252

Built
1970
55 years old, rebuilt 1994
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
126 ft
3 main spans
Daily traffic
33,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-295 SB (SR-9A) over Wheat Rd. is a prestressed concrete stringer/multi-beam or girder carrying I-295 SB (SR-9A) over Wheat Rd. in Duval County, Florida. It was built in 1970 and reconstructed in 1994, so it is 55 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 33,500 vehicles a day, roughly 12% of them trucks, projected to reach 58,123 by 2045. The structure is 126 ft (38.4 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-295 SB (SR-9A)
CrossesWheat Rd.
Location0.5 Mi. S. of 103rd St.
RouteInterstate 295
StateFlorida
Coordinates30.24039, -81.76299
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length126 ft (38.4 m)
Longest span55 ft (16.8 m)
Deck width59 ft (18.1 m)
Roadway width56 ft (17 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,500 (2023)
Projected traffic58,123 by 2045
Trucks12%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-295 SB (SR-9A) over Wheat Rd. built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1994.

What condition is I-295 SB (SR-9A) over Wheat Rd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does I-295 SB (SR-9A) over Wheat Rd. carry?

About 33,500 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is I-295 SB (SR-9A) over Wheat Rd.?

The structure is 126 ft (38.4 m) long with a longest span of 55 ft (16.8 m) and a deck 59 ft wide.

Who owns I-295 SB (SR-9A) over Wheat Rd.?

It is owned by the State Highway Agency.