US Bridges

I-75 SB (SR-93) over US-90 (SR-10)

Good

Columbia County, Florida · I-75 SB over US-90 · Structure no. 290061

Built
1962
63 years old, rebuilt 1995
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
176 ft
4 main spans
Daily traffic
24,472
2022 count
Owner
State
State Highway Agency

About this bridge

I-75 SB (SR-93) over US-90 (SR-10) is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB (SR-93) over US-90 (SR-10) in Columbia County, Florida. It was built in 1962 and reconstructed in 1995, so it is 63 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,472 vehicles a day, roughly 31% of them trucks, projected to reach 42,459 by 2044. The structure is 176 ft (53.6 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-75 SB (SR-93)
CrossesUS-90 (SR-10)
LocationI-75 SB over US-90
RouteInterstate 75
StateFlorida
Coordinates30.17994, -82.68877
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.1 US tons
Inventory rating39.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length176 ft (53.6 m)
Longest span48 ft (14.6 m)
Deck width59 ft (17.9 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,472 (2022)
Projected traffic42,459 by 2044
Trucks31%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$250,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 SB (SR-93) over US-90 (SR-10) built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1995.

What condition is I-75 SB (SR-93) over US-90 (SR-10) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does I-75 SB (SR-93) over US-90 (SR-10) carry?

About 24,472 vehicles per day (2022 count), of which roughly 31% are trucks.

How long is I-75 SB (SR-93) over US-90 (SR-10)?

The structure is 176 ft (53.6 m) long with a longest span of 48 ft (14.6 m) and a deck 59 ft wide.

Who owns I-75 SB (SR-93) over US-90 (SR-10)?

It is owned by the State Highway Agency.