US Bridges

I-75 SR-93 over Rose Creek

Good

Columbia County, Florida · 0.2 MI S of CR-131 · Structure no. 290056

Built
1962
63 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
38 ft
3 main spans
Daily traffic
55,000
2022 count
Owner
State
State Highway Agency

About this bridge

I-75 SR-93 over Rose Creek is a concrete culvert carrying I-75 SR-93 over Rose Creek in Columbia County, Florida. It was built in 1962, so it is 63 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 55,000 vehicles a day, roughly 30% of them trucks, projected to reach 95,425 by 2042. The structure is 38 ft (11.7 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesI-75 SR-93
CrossesRose Creek
Location0.2 MI S of CR-131
RouteInterstate 75
StateFlorida
Coordinates30.08806, -82.63861
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.2 US tons
Inventory rating47.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length38 ft (11.7 m)
Longest span13 ft (4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic55,000 (2022)
Projected traffic95,425 by 2042
Trucks30%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-75 SR-93 over Rose Creek built?

It was built in 1962, making it 63 years old in 2025.

What condition is I-75 SR-93 over Rose Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does I-75 SR-93 over Rose Creek carry?

About 55,000 vehicles per day (2022 count), of which roughly 30% are trucks.

How long is I-75 SR-93 over Rose Creek?

The structure is 38 ft (11.7 m) long with a longest span of 13 ft (4 m).

Who owns I-75 SR-93 over Rose Creek?

It is owned by the State Highway Agency.