CR 858(OILWELLRD) over Camp Keais Strand
GoodCollier County, Florida · 8.2 Mi. W/O SR 29 · Structure no. 034139
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 135 ft
- 3 main spans
- Daily traffic
- 24,170
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CR 858(OILWELLRD) over Camp Keais Strand is a prestressed concrete stringer/multi-beam or girder carrying CR 858(OILWELLRD) over Camp Keais Strand in Collier County, Florida. It was built in 2012, so it is 13 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24,170 vehicles a day, roughly 13% of them trucks, projected to reach 30,213 by 2044. The structure is 135 ft (41.1 m) long and 106 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 858(OILWELLRD) over Camp Keais Strand built?
It was built in 2012, making it 13 years old in 2025.
What condition is CR 858(OILWELLRD) over Camp Keais Strand in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does CR 858(OILWELLRD) over Camp Keais Strand carry?
About 24,170 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is CR 858(OILWELLRD) over Camp Keais Strand?
The structure is 135 ft (41.1 m) long with a longest span of 45 ft (13.7 m) and a deck 106 ft wide.
Who owns CR 858(OILWELLRD) over Camp Keais Strand?
It is owned by the County Highway Agency.