US Bridges

Ted Curcie Road over Drainage Canal

Fair

Collier County, Florida · At CR-92 1.8 MI W/O US-41 · Structure no. 034122

Built
1967
58 years old
Condition
Fair
inspected January 2025
Type
Slab
Concrete
Length
60 ft
4 main spans
Daily traffic
50
2025 count
Owner
County
County Highway Agency

About this bridge

Ted Curcie Road over Drainage Canal is a concrete slab carrying Ted Curcie Road over Drainage Canal in Collier County, Florida. It was built in 1967, so it is 58 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 1% of them trucks, projected to reach 100 by 2045. The structure is 60 ft (18.4 m) long and 24 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesTed Curcie Road
CrossesDrainage Canal
LocationAt CR-92 1.8 MI W/O US-41
RouteCounty Highway 0
StateFlorida
Coordinates25.98878, -81.62158
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating57.3 US tons
Inventory rating34.3 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadH 20
Structure length60 ft (18.4 m)
Longest span15 ft (4.6 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2025)
Projected traffic100 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ted Curcie Road over Drainage Canal built?

It was built in 1967, making it 58 years old in 2025.

What condition is Ted Curcie Road over Drainage Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Ted Curcie Road over Drainage Canal carry?

About 50 vehicles per day (2025 count), of which roughly 1% are trucks.

How long is Ted Curcie Road over Drainage Canal?

The structure is 60 ft (18.4 m) long with a longest span of 15 ft (4.6 m) and a deck 24 ft wide.

Who owns Ted Curcie Road over Drainage Canal?

It is owned by the County Highway Agency.