US Bridges

I-75 NB (SR-93) over Nunya Creek

Good

Collier County, Florida · 2.7 MI West SR-29 · Structure no. 030230

Built
1989
36 years old
Condition
Good
inspected May 2023
Type
Slab
Concrete Continuous
Length
240 ft
8 main spans
Daily traffic
14,261
2022 count
Owner
State
State Highway Agency

About this bridge

I-75 NB (SR-93) over Nunya Creek is a concrete continuous slab carrying I-75 NB (SR-93) over Nunya Creek in Collier County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,261 vehicles a day, roughly 13% of them trucks, projected to reach 24,742 by 2044. The structure is 240 ft (73.2 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-75 NB (SR-93)
CrossesNunya Creek
Location2.7 MI West SR-29
RouteInterstate 75
StateFlorida
Coordinates26.15419, -81.38926
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.9 US tons
Inventory rating27.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20 + Mod
Structure length240 ft (73.2 m)
Longest span30 ft (9.1 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,261 (2022)
Projected traffic24,742 by 2044
Trucks13%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-75 NB (SR-93) over Nunya Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is I-75 NB (SR-93) over Nunya Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I-75 NB (SR-93) over Nunya Creek carry?

About 14,261 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is I-75 NB (SR-93) over Nunya Creek?

The structure is 240 ft (73.2 m) long with a longest span of 30 ft (9.1 m) and a deck 43 ft wide.

Who owns I-75 NB (SR-93) over Nunya Creek?

It is owned by the State Highway Agency.