US Bridges

CR 224 over Pinewood Drainage Canal

Good

Clay County, Florida · 0.2 MI N of CR 220 · Structure no. 714058

Built
1997
28 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
28 ft
3 main spans
Daily traffic
20,400
2024 count
Owner
County
County Highway Agency

About this bridge

CR 224 over Pinewood Drainage Canal is a concrete culvert carrying CR 224 over Pinewood Drainage Canal in Clay County, Florida. It was built in 1997, so it is 28 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,400 vehicles a day, roughly 1% of them trucks, projected to reach 35,394 by 2042. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 224
CrossesPinewood Drainage Canal
Location0.2 MI N of CR 220
RouteCounty Highway 224
StateFlorida
Coordinates30.1035, -81.77639
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,400 (2024)
Projected traffic35,394 by 2042
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 224 over Pinewood Drainage Canal built?

It was built in 1997, making it 28 years old in 2025.

What condition is CR 224 over Pinewood Drainage Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CR 224 over Pinewood Drainage Canal carry?

About 20,400 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is CR 224 over Pinewood Drainage Canal?

The structure is 28 ft (8.5 m) long with a longest span of 8 ft (2.4 m).

Who owns CR 224 over Pinewood Drainage Canal?

It is owned by the County Highway Agency.