US Bridges

SR 23 SB 35.3 over Oakleaf Plantation Pkwy

Good

Clay County, Florida · 4.16 MI N of SR 21 · Structure no. 710102

Built
2018
7 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
206 ft
2 main spans
Daily traffic
6,800
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 23 SB 35.3 over Oakleaf Plantation Pkwy is a prestressed concrete stringer/multi-beam or girder carrying SR 23 SB 35.3 over Oakleaf Plantation Pkwy in Clay County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,800 vehicles a day, roughly 6% of them trucks, projected to reach 11,798 by 2044. The structure is 206 ft (62.9 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 23 SB 35.3
CrossesOakleaf Plantation Pkwy
Location4.16 MI N of SR 21
RouteState Highway 23
StateFlorida
Coordinates30.15956, -81.83114
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.2 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length206 ft (62.9 m)
Longest span103 ft (31.5 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,800 (2022)
Projected traffic11,798 by 2044
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 23 SB 35.3 over Oakleaf Plantation Pkwy built?

It was built in 2018, making it 7 years old in 2025.

What condition is SR 23 SB 35.3 over Oakleaf Plantation Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does SR 23 SB 35.3 over Oakleaf Plantation Pkwy carry?

About 6,800 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SR 23 SB 35.3 over Oakleaf Plantation Pkwy?

The structure is 206 ft (62.9 m) long with a longest span of 103 ft (31.5 m) and a deck 45 ft wide.

Who owns SR 23 SB 35.3 over Oakleaf Plantation Pkwy?

It is owned by the State Toll Authority.