US Bridges

NW 29th Manor over C-42 Canal

Good

Broward County, Florida · 0.2MI E of 115th Terrace · Structure no. 868302

Built
1975
50 years old
Condition
Good
inspected April 2023
Type
Slab
Prestressed Concrete
Length
76 ft
3 main spans
Daily traffic
2,000
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

NW 29th Manor over C-42 Canal is a prestressed concrete slab carrying NW 29th Manor over C-42 Canal in Broward County, Florida. It was built in 1975, so it is 50 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 5% of them trucks, projected to reach 2,400 by 2042. The structure is 76 ft (23.3 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNW 29th Manor
CrossesC-42 Canal
Location0.2MI E of 115th Terrace
RouteCity Street 0
StateFlorida
Coordinates26.16243, -80.29797
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating54 US tons
Inventory rating48 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length76 ft (23.3 m)
Longest span28 ft (8.5 m)
Deck width36 ft (10.9 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2023)
Projected traffic2,400 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NW 29th Manor over C-42 Canal built?

It was built in 1975, making it 50 years old in 2025.

What condition is NW 29th Manor over C-42 Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does NW 29th Manor over C-42 Canal carry?

About 2,000 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is NW 29th Manor over C-42 Canal?

The structure is 76 ft (23.3 m) long with a longest span of 28 ft (8.5 m) and a deck 36 ft wide.

Who owns NW 29th Manor over C-42 Canal?

It is owned by the City or Municipal Highway Agency.