US Bridges

NW 11th Place over 1-A Canal

Good

Broward County, Florida · 150FT W of NW 75th Terr · Structure no. 868030

Built
1975
50 years old
Condition
Good
inspected June 2023
Type
Slab
Prestressed Concrete
Length
46 ft
2 main spans
Daily traffic
4,320
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

NW 11th Place over 1-A Canal is a prestressed concrete slab carrying NW 11th Place over 1-A Canal in Broward County, Florida. It was built in 1975, so it is 50 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,320 vehicles a day, roughly 2% of them trucks, projected to reach 5,184 by 2042. The structure is 46 ft (13.9 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNW 11th Place
Crosses1-A Canal
Location150FT W of NW 75th Terr
RouteCity Street 0
StateFlorida
Coordinates26.13948, -80.25091
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.8 US tons
Inventory rating43.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadH 20
Structure length46 ft (13.9 m)
Longest span23 ft (6.9 m)
Deck width36 ft (11 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,320 (2023)
Projected traffic5,184 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NW 11th Place over 1-A Canal built?

It was built in 1975, making it 50 years old in 2025.

What condition is NW 11th Place over 1-A Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does NW 11th Place over 1-A Canal carry?

About 4,320 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is NW 11th Place over 1-A Canal?

The structure is 46 ft (13.9 m) long with a longest span of 23 ft (6.9 m) and a deck 36 ft wide.

Who owns NW 11th Place over 1-A Canal?

It is owned by the City or Municipal Highway Agency.