SE 13th Street over Cerro Gordo River
FairPosted for loadBroward County, Florida · 100 Ft. E of Cordova Road · Structure no. 865765
- Built
- 1952
- 73 years old
- Condition
- Fair
- inspected September 2023
- Type
- Tee Beam
- Concrete
- Length
- 180 ft
- 9 main spans
- Daily traffic
- 1,440
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
SE 13th Street over Cerro Gordo River is a concrete tee beam carrying SE 13th Street over Cerro Gordo River in Broward County, Florida. It was built in 1952, so it is 73 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,440 vehicles a day, roughly 3% of them trucks, projected to reach 1,728 by 2042. The structure is 180 ft (55 m) long and 26 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SE 13th Street over Cerro Gordo River built?
It was built in 1952, making it 73 years old in 2025.
What condition is SE 13th Street over Cerro Gordo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does SE 13th Street over Cerro Gordo River carry?
About 1,440 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is SE 13th Street over Cerro Gordo River?
The structure is 180 ft (55 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.
Who owns SE 13th Street over Cerro Gordo River?
It is owned by the City or Municipal Highway Agency.