Flamingo Rd. NB over C-9 (snake Creek Canal)
GoodBroward County, Florida · 1.0 MI S of Miramar Pkwy · Structure no. 864120
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected April 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 126 ft
- 3 main spans
- Daily traffic
- 19,300
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Flamingo Rd. NB over C-9 (snake Creek Canal) is a prestressed concrete slab carrying Flamingo Rd. NB over C-9 (snake Creek Canal) in Broward County, Florida. It was built in 2006, so it is 19 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,300 vehicles a day, roughly 2% of them trucks, projected to reach 28,950 by 2044. The structure is 126 ft (38.4 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Flamingo Rd. NB over C-9 (snake Creek Canal) built?
It was built in 2006, making it 19 years old in 2025.
What condition is Flamingo Rd. NB over C-9 (snake Creek Canal) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Flamingo Rd. NB over C-9 (snake Creek Canal) carry?
About 19,300 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Flamingo Rd. NB over C-9 (snake Creek Canal)?
The structure is 126 ft (38.4 m) long with a longest span of 42 ft (12.8 m) and a deck 42 ft wide.
Who owns Flamingo Rd. NB over C-9 (snake Creek Canal)?
It is owned by the County Highway Agency.