US Bridges

SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd

Good

Broward County, Florida · 2.74 Mi. S of SR 834 · Structure no. 861018

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
116 ft
1 main span
Daily traffic
38,600
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd is a prestressed concrete stringer/multi-beam or girder carrying SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd in Broward County, Florida. It was built in 2024, so it is 1 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 38,600 vehicles a day, roughly 7% of them trucks, projected to reach 66,971 by 2042. The structure is 116 ft (35.4 m) long and 87 ft wide.

CarriesSR 869 Saw SB 8.19
CrossesSR 814 Atlantic Blvd
Location2.74 Mi. S of SR 834
RouteState Highway 869
StateFlorida
Coordinates26.23325, -80.29638
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.5 US tons
Inventory rating43.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length116 ft (35.4 m)
Longest span116 ft (35.4 m)
Deck width87 ft (26.6 m)
Roadway width85 ft (25.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,600 (2024)
Projected traffic66,971 by 2042
Trucks7%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd built?

It was built in 2024, making it 1 years old in 2025.

What condition is SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd carry?

About 38,600 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd?

The structure is 116 ft (35.4 m) long with a longest span of 116 ft (35.4 m) and a deck 87 ft wide.

Who owns SR 869 Saw SB 8.19 over SR 814 Atlantic Blvd?

It is owned by the State Toll Authority.