Griffin Road over Pump Station 9 Canal

Good

Broward County, Florida · 0.6MI West of US-27 · Structure no. 860801

Built
2018
7 years old
Condition
Good
inspected November 2024
Type
Slab
Prestressed Concrete
Length
118 ft
3 main spans
Daily traffic
200
2024 count
Owner
State
Other State Agency

About this bridge

Griffin Road over Pump Station 9 Canal is a prestressed concrete slab carrying Griffin Road over Pump Station 9 Canal in Broward County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 300 by 2044. The structure is 118 ft (36 m) long and 28 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesGriffin Road
CrossesPump Station 9 Canal
Location0.6MI West of US-27
RouteCounty Highway 0
StateFlorida
Coordinates26.06083, -80.44306
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.8 US tons
Inventory rating50.8 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length118 ft (36 m)
Longest span40 ft (12.2 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2024)
Projected traffic300 by 2044
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther State Agency
Maintained byOther State Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Griffin Road over Pump Station 9 Canal built?

It was built in 2018, making it 7 years old in 2025.

What condition is Griffin Road over Pump Station 9 Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Griffin Road over Pump Station 9 Canal carry?

About 200 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is Griffin Road over Pump Station 9 Canal?

The structure is 118 ft (36 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.

Who owns Griffin Road over Pump Station 9 Canal?

It is owned by the Other State Agency.