US Bridges

I-95 SB on Ramp over C-13 Canal

Good

Broward County, Florida · .25MI S of W Oakland Pk B · Structure no. 860682

Built
2020
5 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
141 ft
1 main span
Daily traffic
117,000
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 SB on Ramp over C-13 Canal is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB on Ramp over C-13 Canal in Broward County, Florida. It was built in 2020, so it is 5 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 117,000 vehicles a day, roughly 3% of them trucks, projected to reach 202,995 by 2042. The structure is 141 ft (43 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-95 SB on Ramp
CrossesC-13 Canal
Location.25MI S of W Oakland Pk B
RouteInterstate 95
StateFlorida
Coordinates26.16261, -80.16267
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.2 US tons
Inventory rating43.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length141 ft (43 m)
Longest span141 ft (43 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic117,000 (2023)
Projected traffic202,995 by 2042
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-95 SB on Ramp over C-13 Canal built?

It was built in 2020, making it 5 years old in 2025.

What condition is I-95 SB on Ramp over C-13 Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does I-95 SB on Ramp over C-13 Canal carry?

About 117,000 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is I-95 SB on Ramp over C-13 Canal?

The structure is 141 ft (43 m) long with a longest span of 141 ft (43 m) and a deck 30 ft wide.

Who owns I-95 SB on Ramp over C-13 Canal?

It is owned by the State Highway Agency.