US Bridges

I595 EB to SR84 EB over SR84 EB Ramp to I595 EB

Good

Broward County, Florida · 2.7MI. W of University DR · Structure no. 860662

Built
2013
12 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
480 ft
4 main spans
Daily traffic
4,800
2022 count
Owner
State
State Highway Agency

About this bridge

I595 EB to SR84 EB over SR84 EB Ramp to I595 EB is a steel continuous stringer/multi-beam or girder carrying I595 EB to SR84 EB over SR84 EB Ramp to I595 EB in Broward County, Florida. It was built in 2013, so it is 12 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,800 vehicles a day, roughly 3% of them trucks, projected to reach 8,328 by 2044. The structure is 480 ft (146.3 m) long and 30 ft wide.

CarriesI595 EB to SR84 EB
CrossesSR84 EB Ramp to I595 EB
Location2.7MI. W of University DR
RouteInterstate 595
StateFlorida
Coordinates26.10914, -80.29256
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.2 US tons
Inventory rating37.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length480 ft (146.3 m)
Longest span150 ft (45.7 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,800 (2022)
Projected traffic8,328 by 2044
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I595 EB to SR84 EB over SR84 EB Ramp to I595 EB built?

It was built in 2013, making it 12 years old in 2025.

What condition is I595 EB to SR84 EB over SR84 EB Ramp to I595 EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does I595 EB to SR84 EB over SR84 EB Ramp to I595 EB carry?

About 4,800 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is I595 EB to SR84 EB over SR84 EB Ramp to I595 EB?

The structure is 480 ft (146.3 m) long with a longest span of 150 ft (45.7 m) and a deck 30 ft wide.

Who owns I595 EB to SR84 EB over SR84 EB Ramp to I595 EB?

It is owned by the State Highway Agency.