I75(SR93)REST Area over C-123 Miami Canal

Good

Broward County, Florida · 11.6 Miles W of US-27 · Structure no. 860621

Built
1999
26 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
345 ft
3 main spans
Daily traffic
1,340
2023 count
Owner
State
State Highway Agency

About this bridge

I75(SR93)REST Area over C-123 Miami Canal is a prestressed concrete stringer/multi-beam or girder carrying I75(SR93)REST Area over C-123 Miami Canal in Broward County, Florida. It was built in 1999, so it is 26 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,340 vehicles a day, roughly 15% of them trucks, projected to reach 1,608 by 2042. The structure is 345 ft (105.1 m) long and 47 ft wide.

CarriesI75(SR93)REST Area
CrossesC-123 Miami Canal
Location11.6 Miles W of US-27
StateFlorida
Coordinates26.14598, -80.63293
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating85.6 US tons
Inventory rating51.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length345 ft (105.1 m)
Longest span130 ft (39.6 m)
Deck width47 ft (14.2 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,340 (2023)
Projected traffic1,608 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I75(SR93)REST Area over C-123 Miami Canal built?

It was built in 1999, making it 26 years old in 2025.

What condition is I75(SR93)REST Area over C-123 Miami Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does I75(SR93)REST Area over C-123 Miami Canal carry?

About 1,340 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is I75(SR93)REST Area over C-123 Miami Canal?

The structure is 345 ft (105.1 m) long with a longest span of 130 ft (39.6 m) and a deck 47 ft wide.

Who owns I75(SR93)REST Area over C-123 Miami Canal?

It is owned by the State Highway Agency.