SR869 NB Saw 5.46 over CR 870 Commercial Blvd
GoodBroward County, Florida · Interc SR-869 and CR-870 · Structure no. 860487
- Built
- 1986
- 39 years old, rebuilt 2004
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 162 ft
- 2 main spans
- Daily traffic
- 44,250
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR869 NB Saw 5.46 over CR 870 Commercial Blvd is a prestressed concrete stringer/multi-beam or girder carrying SR869 NB Saw 5.46 over CR 870 Commercial Blvd in Broward County, Florida. It was built in 1986 and reconstructed in 2004, so it is 39 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 44,250 vehicles a day, roughly 7% of them trucks, projected to reach 76,774 by 2042. The structure is 162 ft (49.4 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR869 NB Saw 5.46 over CR 870 Commercial Blvd built?
It was built in 1986, making it 39 years old in 2025. It was reconstructed in 2004.
What condition is SR869 NB Saw 5.46 over CR 870 Commercial Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does SR869 NB Saw 5.46 over CR 870 Commercial Blvd carry?
About 44,250 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is SR869 NB Saw 5.46 over CR 870 Commercial Blvd?
The structure is 162 ft (49.4 m) long with a longest span of 81 ft (24.7 m) and a deck 59 ft wide.
Who owns SR869 NB Saw 5.46 over CR 870 Commercial Blvd?
It is owned by the State Toll Authority.