US Bridges

I-595 EB (SR-862) over EB SR-84

Good

Broward County, Florida · I-595 and SR-84 · Structure no. 860425

Built
1988
37 years old, rebuilt 2013
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
315 ft
4 main spans
Daily traffic
109,250
2022 count
Owner
State
State Highway Agency

About this bridge

I-595 EB (SR-862) over EB SR-84 is a prestressed concrete stringer/multi-beam or girder carrying I-595 EB (SR-862) over EB SR-84 in Broward County, Florida. It was built in 1988 and reconstructed in 2013, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 109,250 vehicles a day, roughly 8% of them trucks, projected to reach 189,549 by 2044. The structure is 315 ft (96 m) long and 99 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-595 EB (SR-862)
CrossesEB SR-84
LocationI-595 and SR-84
RouteInterstate 595
StateFlorida
Coordinates26.08374, -80.19733
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating31.7 US tons
Inventory rating18 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length315 ft (96 m)
Longest span136 ft (41.4 m)
Deck width99 ft (30.3 m)
Roadway width96 ft (29.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic109,250 (2022)
Projected traffic189,549 by 2044
Trucks8%
Lanes on structure5
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-595 EB (SR-862) over EB SR-84 built?

It was built in 1988, making it 37 years old in 2025. It was reconstructed in 2013.

What condition is I-595 EB (SR-862) over EB SR-84 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I-595 EB (SR-862) over EB SR-84 carry?

About 109,250 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is I-595 EB (SR-862) over EB SR-84?

The structure is 315 ft (96 m) long with a longest span of 136 ft (41.4 m) and a deck 99 ft wide.

Who owns I-595 EB (SR-862) over EB SR-84?

It is owned by the State Highway Agency.