US Bridges

NB I-75 Ramp G-H over US-27 (SR-25)

Fair

Broward County, Florida · I-75 US-27 Interchange · Structure no. 860335

Built
1982
43 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
276 ft
4 main spans
Daily traffic
1,200
2024 count
Owner
State
State Highway Agency

About this bridge

NB I-75 Ramp G-H over US-27 (SR-25) is a prestressed concrete stringer/multi-beam or girder carrying NB I-75 Ramp G-H over US-27 (SR-25) in Broward County, Florida. It was built in 1982, so it is 43 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,200 vehicles a day, roughly 24% of them trucks, projected to reach 2,082 by 2042. The structure is 276 ft (84.1 m) long and 68 ft wide.

CarriesNB I-75 Ramp G-H
CrossesUS-27 (SR-25)
LocationI-75 US-27 Interchange
RouteInterstate 75
StateFlorida
Coordinates26.14507, -80.44199
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.4 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20 + Mod
Structure length276 ft (84.1 m)
Longest span93 ft (28.3 m)
Deck width68 ft (20.6 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2024)
Projected traffic2,082 by 2042
Trucks24%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB I-75 Ramp G-H over US-27 (SR-25) built?

It was built in 1982, making it 43 years old in 2025.

What condition is NB I-75 Ramp G-H over US-27 (SR-25) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does NB I-75 Ramp G-H over US-27 (SR-25) carry?

About 1,200 vehicles per day (2024 count), of which roughly 24% are trucks.

How long is NB I-75 Ramp G-H over US-27 (SR-25)?

The structure is 276 ft (84.1 m) long with a longest span of 93 ft (28.3 m) and a deck 68 ft wide.

Who owns NB I-75 Ramp G-H over US-27 (SR-25)?

It is owned by the State Highway Agency.