NB I-95 (SR-9) over NW 6th ST (sistrunk Blv)
GoodBroward County, Florida · 0.50 Mi. N of SR-842 · Structure no. 860273
- Built
- 1975
- 50 years old, rebuilt 2023
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 158 ft
- 3 main spans
- Daily traffic
- 157,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) is a prestressed concrete stringer/multi-beam or girder carrying NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) in Broward County, Florida. It was built in 1975 and reconstructed in 2023, so it is 50 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 157,000 vehicles a day, roughly 10% of them trucks, projected to reach 272,395 by 2044. The structure is 158 ft (48.3 m) long and 112 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2023.
What condition is NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) carry?
About 157,000 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is NB I-95 (SR-9) over NW 6th ST (sistrunk Blv)?
The structure is 158 ft (48.3 m) long with a longest span of 83 ft (25.3 m) and a deck 112 ft wide.
Who owns NB I-95 (SR-9) over NW 6th ST (sistrunk Blv)?
It is owned by the State Highway Agency.