US Bridges

NB I-95 (SR-9) over NW 6th ST (sistrunk Blv)

Good

Broward County, Florida · 0.50 Mi. N of SR-842 · Structure no. 860273

Built
1975
50 years old, rebuilt 2023
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
158 ft
3 main spans
Daily traffic
157,000
2022 count
Owner
State
State Highway Agency

About this bridge

NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) is a prestressed concrete stringer/multi-beam or girder carrying NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) in Broward County, Florida. It was built in 1975 and reconstructed in 2023, so it is 50 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 157,000 vehicles a day, roughly 10% of them trucks, projected to reach 272,395 by 2044. The structure is 158 ft (48.3 m) long and 112 ft wide.

CarriesNB I-95 (SR-9)
CrossesNW 6th ST (sistrunk Blv)
Location0.50 Mi. N of SR-842
RouteInterstate 95
StateFlorida
Coordinates26.12911, -80.16919
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48 US tons
Inventory rating37.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length158 ft (48.3 m)
Longest span83 ft (25.3 m)
Deck width112 ft (34.1 m)
Roadway width106 ft (32.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic157,000 (2022)
Projected traffic272,395 by 2044
Trucks10%
Lanes on structure7
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2023.

What condition is NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does NB I-95 (SR-9) over NW 6th ST (sistrunk Blv) carry?

About 157,000 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is NB I-95 (SR-9) over NW 6th ST (sistrunk Blv)?

The structure is 158 ft (48.3 m) long with a longest span of 83 ft (25.3 m) and a deck 112 ft wide.

Who owns NB I-95 (SR-9) over NW 6th ST (sistrunk Blv)?

It is owned by the State Highway Agency.