US Bridges

I-95 (SR-9) NB over Cypress Creek RD(NW62st)

Fair

Broward County, Florida · 0.35 MI N of Andrews Ave · Structure no. 860240

Built
1975
50 years old, rebuilt 2019
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
319 ft
4 main spans
Daily traffic
125,500
2024 count
Owner
State
State Highway Agency

About this bridge

I-95 (SR-9) NB over Cypress Creek RD(NW62st) is a prestressed concrete stringer/multi-beam or girder carrying I-95 (SR-9) NB over Cypress Creek RD(NW62st) in Broward County, Florida. It was built in 1975 and reconstructed in 2019, so it is 50 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 125,500 vehicles a day, roughly 10% of them trucks, projected to reach 217,742 by 2044. The structure is 319 ft (97.2 m) long and 88 ft wide.

CarriesI-95 (SR-9) NB
CrossesCypress Creek RD(NW62st)
Location0.35 MI N of Andrews Ave
RouteInterstate 95
StateFlorida
Coordinates26.20361, -80.14374
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating37.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length319 ft (97.2 m)
Longest span100 ft (30.4 m)
Deck width88 ft (26.9 m)
Roadway width85 ft (25.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125,500 (2024)
Projected traffic217,742 by 2044
Trucks10%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 (SR-9) NB over Cypress Creek RD(NW62st) built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2019.

What condition is I-95 (SR-9) NB over Cypress Creek RD(NW62st) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I-95 (SR-9) NB over Cypress Creek RD(NW62st) carry?

About 125,500 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is I-95 (SR-9) NB over Cypress Creek RD(NW62st)?

The structure is 319 ft (97.2 m) long with a longest span of 100 ft (30.4 m) and a deck 88 ft wide.

Who owns I-95 (SR-9) NB over Cypress Creek RD(NW62st)?

It is owned by the State Highway Agency.