SR821 NB Heft 46.2 over SR 817 University &canal
FairBroward County, Florida · 1.95 Mi. E of SR-847 · Structure no. 860192
- Built
- 1972
- 53 years old, rebuilt 2021
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 297 ft
- 4 main spans
- Daily traffic
- 38,400
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
SR821 NB Heft 46.2 over SR 817 University &canal is a steel stringer/multi-beam or girder carrying SR821 NB Heft 46.2 over SR 817 University &canal in Broward County, Florida. It was built in 1972 and reconstructed in 2021, so it is 53 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 38,400 vehicles a day, roughly 6% of them trucks, projected to reach 66,624 by 2042. The structure is 297 ft (90.5 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR821 NB Heft 46.2 over SR 817 University &canal built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2021.
What condition is SR821 NB Heft 46.2 over SR 817 University &canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR821 NB Heft 46.2 over SR 817 University &canal carry?
About 38,400 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is SR821 NB Heft 46.2 over SR 817 University &canal?
The structure is 297 ft (90.5 m) long with a longest span of 121 ft (36.9 m) and a deck 66 ft wide.
Who owns SR821 NB Heft 46.2 over SR 817 University &canal?
It is owned by the State Toll Authority.