US Bridges

SR-91 Tpk 61.328 over Mid-River Canal C-13

Good

Broward County, Florida · 0.6 Mi. N of SR-816 · Structure no. 860180

Built
1956
69 years old, rebuilt 2011
Condition
Good
inspected September 2023
Type
Slab
Concrete
Length
91 ft
3 main spans
Daily traffic
142,000
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR-91 Tpk 61.328 over Mid-River Canal C-13 is a concrete slab carrying SR-91 Tpk 61.328 over Mid-River Canal C-13 in Broward County, Florida. It was built in 1956 and reconstructed in 2011, so it is 69 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 142,000 vehicles a day, roughly 14% of them trucks, projected to reach 246,370 by 2042. The structure is 91 ft (27.8 m) long and 145 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-91 Tpk 61.328
CrossesMid-River Canal C-13
Location0.6 Mi. N of SR-816
RouteState Highway 91
StateFlorida
Coordinates26.17283, -80.21994
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating39.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length91 ft (27.8 m)
Longest span31 ft (9.4 m)
Deck width145 ft (44.2 m)
Roadway width140 ft (42.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic142,000 (2023)
Projected traffic246,370 by 2042
Trucks14%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$112,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-91 Tpk 61.328 over Mid-River Canal C-13 built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2011.

What condition is SR-91 Tpk 61.328 over Mid-River Canal C-13 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SR-91 Tpk 61.328 over Mid-River Canal C-13 carry?

About 142,000 vehicles per day (2023 count), of which roughly 14% are trucks.

How long is SR-91 Tpk 61.328 over Mid-River Canal C-13?

The structure is 91 ft (27.8 m) long with a longest span of 31 ft (9.4 m) and a deck 145 ft wide.

Who owns SR-91 Tpk 61.328 over Mid-River Canal C-13?

It is owned by the State Toll Authority.