US Bridges

SR 822 Sheridan ST over Canal C-10

Good

Broward County, Florida · 0.2 MI E of I-95 on SR822 · Structure no. 860045

Built
1965
60 years old, rebuilt 1995
Condition
Good
inspected September 2023
Type
Slab
Concrete Continuous
Length
142 ft
5 main spans
Daily traffic
47,000
2023 count
Owner
State
State Highway Agency

About this bridge

SR 822 Sheridan ST over Canal C-10 is a concrete continuous slab carrying SR 822 Sheridan ST over Canal C-10 in Broward County, Florida. It was built in 1965 and reconstructed in 1995, so it is 60 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 47,000 vehicles a day, roughly 7% of them trucks, projected to reach 81,545 by 2042. The structure is 142 ft (43.3 m) long and 124 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 822 Sheridan ST
CrossesCanal C-10
Location0.2 MI E of I-95 on SR822
RouteState Highway 822
StateFlorida
Coordinates26.03318, -80.16181
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69 US tons
Inventory rating41.4 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length142 ft (43.3 m)
Longest span29 ft (8.7 m)
Deck width124 ft (37.9 m)
Roadway width100 ft (30.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic47,000 (2023)
Projected traffic81,545 by 2042
Trucks7%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was SR 822 Sheridan ST over Canal C-10 built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1995.

What condition is SR 822 Sheridan ST over Canal C-10 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SR 822 Sheridan ST over Canal C-10 carry?

About 47,000 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is SR 822 Sheridan ST over Canal C-10?

The structure is 142 ft (43.3 m) long with a longest span of 29 ft (8.7 m) and a deck 124 ft wide.

Who owns SR 822 Sheridan ST over Canal C-10?

It is owned by the State Highway Agency.