SR-822 (sheridan) over Intracoastal Waterway
FairBroward County, Florida · Sheridan ST & SR-A1A · Structure no. 860043
- Built
- 1962
- 63 years old, rebuilt 2023
- Condition
- Fair
- inspected August 2023
- Type
- Movable - Bascule
- Steel
- Length
- 354 ft
- 1 main span
- Daily traffic
- 18,200
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-822 (sheridan) over Intracoastal Waterway is a steel movable - bascule carrying SR-822 (sheridan) over Intracoastal Waterway in Broward County, Florida. It was built in 1962 and reconstructed in 2023, so it is 63 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,200 vehicles a day, roughly 11% of them trucks, projected to reach 31,577 by 2044. The structure is 354 ft (108 m) long and 58 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-822 (sheridan) over Intracoastal Waterway built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2023.
What condition is SR-822 (sheridan) over Intracoastal Waterway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR-822 (sheridan) over Intracoastal Waterway carry?
About 18,200 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is SR-822 (sheridan) over Intracoastal Waterway?
The structure is 354 ft (108 m) long with a longest span of 112 ft (34.1 m) and a deck 58 ft wide.
Who owns SR-822 (sheridan) over Intracoastal Waterway?
It is owned by the State Highway Agency.