US Bridges

Micco Road over Sottile Canal

Good

Brevard County, Florida · 2 MI West of US1 · Structure no. 704205

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
95 ft
1 main span
Daily traffic
2,300
2024 count
Owner
County
County Highway Agency

About this bridge

Micco Road over Sottile Canal is a prestressed concrete stringer/multi-beam or girder carrying Micco Road over Sottile Canal in Brevard County, Florida. It was built in 2024, so it is 1 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,300 vehicles a day, roughly 4% of them trucks, projected to reach 3,991 by 2046. The structure is 95 ft (29 m) long and 47 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesMicco Road
CrossesSottile Canal
Location2 MI West of US1
RouteCounty Highway 0
StateFlorida
Coordinates27.88072, -80.53319
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.4 US tons
Inventory rating39.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length95 ft (29 m)
Longest span95 ft (29 m)
Deck width47 ft (14.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,300 (2024)
Projected traffic3,991 by 2046
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Micco Road over Sottile Canal built?

It was built in 2024, making it 1 years old in 2025.

What condition is Micco Road over Sottile Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Micco Road over Sottile Canal carry?

About 2,300 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Micco Road over Sottile Canal?

The structure is 95 ft (29 m) long with a longest span of 95 ft (29 m) and a deck 47 ft wide.

Who owns Micco Road over Sottile Canal?

It is owned by the County Highway Agency.