US Bridges

CR-404(PINEDA Cwy) over Fec Railway

Good

Brevard County, Florida · 0.3MI. W/O US-1 · Structure no. 704196

Built
2020
5 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
117 ft
1 main span
Daily traffic
52,500
2024 count
Owner
County
County Highway Agency

About this bridge

CR-404(PINEDA Cwy) over Fec Railway is a prestressed concrete stringer/multi-beam or girder carrying CR-404(PINEDA Cwy) over Fec Railway in Brevard County, Florida. It was built in 2020, so it is 5 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 52,500 vehicles a day, roughly 6% of them trucks, projected to reach 91,088 by 2044. The structure is 117 ft (35.7 m) long and 102 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR-404(PINEDA Cwy)
CrossesFec Railway
Location0.3MI. W/O US-1
RouteCounty Highway 404
StateFlorida
Coordinates28.20408, -80.66649
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60.6 US tons
Inventory rating39.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length117 ft (35.7 m)
Longest span117 ft (35.7 m)
Deck width102 ft (31 m)
Roadway width86 ft (26.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic52,500 (2024)
Projected traffic91,088 by 2044
Trucks6%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR-404(PINEDA Cwy) over Fec Railway built?

It was built in 2020, making it 5 years old in 2025.

What condition is CR-404(PINEDA Cwy) over Fec Railway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does CR-404(PINEDA Cwy) over Fec Railway carry?

About 52,500 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is CR-404(PINEDA Cwy) over Fec Railway?

The structure is 117 ft (35.7 m) long with a longest span of 117 ft (35.7 m) and a deck 102 ft wide.

Who owns CR-404(PINEDA Cwy) over Fec Railway?

It is owned by the County Highway Agency.