US Bridges

CR-516 over I-95

Good

Brevard County, Florida · CR-516 over I-95 · Structure no. 700188

Built
1988
37 years old, rebuilt 2009
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
292 ft
4 main spans
Daily traffic
47,500
2022 count
Owner
State
State Highway Agency

About this bridge

CR-516 over I-95 is a prestressed concrete stringer/multi-beam or girder carrying CR-516 over I-95 in Brevard County, Florida. It was built in 1988 and reconstructed in 2009, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 47,500 vehicles a day, roughly 6% of them trucks, projected to reach 82,412 by 2044. The structure is 292 ft (89 m) long and 120 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCR-516
CrossesI-95
LocationCR-516 over I-95
RouteCounty Highway 516
StateFlorida
Coordinates28.03536, -80.65665
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.1 US tons
Inventory rating42.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length292 ft (89 m)
Longest span105 ft (32.1 m)
Deck width120 ft (36.7 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic47,500 (2022)
Projected traffic82,412 by 2044
Trucks6%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR-516 over I-95 built?

It was built in 1988, making it 37 years old in 2025. It was reconstructed in 2009.

What condition is CR-516 over I-95 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does CR-516 over I-95 carry?

About 47,500 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is CR-516 over I-95?

The structure is 292 ft (89 m) long with a longest span of 105 ft (32.1 m) and a deck 120 ft wide.

Who owns CR-516 over I-95?

It is owned by the State Highway Agency.