US Bridges

I-95 SB over CR-5A

Fair

Brevard County, Florida · I-95 SB - CR-5A · Structure no. 700102

Built
1969
56 years old, rebuilt 2017
Condition
Fair
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
221 ft
4 main spans
Daily traffic
19,400
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 SB over CR-5A is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB over CR-5A in Brevard County, Florida. It was built in 1969 and reconstructed in 2017, so it is 56 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 19,400 vehicles a day, roughly 21% of them trucks, projected to reach 33,658 by 2044. The structure is 221 ft (67.4 m) long and 59 ft wide.

CarriesI-95 SB
CrossesCR-5A
LocationI-95 SB - CR-5A
RouteInterstate 95
StateFlorida
Coordinates28.77122, -80.89408
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.4 US tons
Inventory rating38.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length221 ft (67.4 m)
Longest span70 ft (21.2 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,400 (2022)
Projected traffic33,658 by 2044
Trucks21%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 SB over CR-5A built?

It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2017.

What condition is I-95 SB over CR-5A in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does I-95 SB over CR-5A carry?

About 19,400 vehicles per day (2022 count), of which roughly 21% are trucks.

How long is I-95 SB over CR-5A?

The structure is 221 ft (67.4 m) long with a longest span of 70 ft (21.2 m) and a deck 59 ft wide.

Who owns I-95 SB over CR-5A?

It is owned by the State Highway Agency.