US Bridges

SR-528 over SR-3

Good

Brevard County, Florida · SR-528 WB over SR-3 · Structure no. 700017

Built
1971
54 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
175 ft
3 main spans
Daily traffic
15,600
2022 count
Owner
State
State Highway Agency

About this bridge

SR-528 over SR-3 is a prestressed concrete stringer/multi-beam or girder carrying SR-528 over SR-3 in Brevard County, Florida. It was built in 1971, so it is 54 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,600 vehicles a day, roughly 7% of them trucks, projected to reach 27,066 by 2044. The structure is 175 ft (53.3 m) long and 35 ft wide.

CarriesSR-528
CrossesSR-3
LocationSR-528 WB over SR-3
RouteState Highway 528
StateFlorida
Coordinates28.40537, -80.70578
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length175 ft (53.3 m)
Longest span99 ft (30.2 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,600 (2022)
Projected traffic27,066 by 2044
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-528 over SR-3 built?

It was built in 1971, making it 54 years old in 2025.

What condition is SR-528 over SR-3 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR-528 over SR-3 carry?

About 15,600 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is SR-528 over SR-3?

The structure is 175 ft (53.3 m) long with a longest span of 99 ft (30.2 m) and a deck 35 ft wide.

Who owns SR-528 over SR-3?

It is owned by the State Highway Agency.