US Bridges

SR-405 WB over Fecrr

Good

Brevard County, Florida · SR-405 WB - Fecrr · Structure no. 700002

Built
1969
56 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
189 ft
3 main spans
Daily traffic
6,450
2023 count
Owner
State
State Highway Agency

About this bridge

SR-405 WB over Fecrr is a prestressed concrete stringer/multi-beam or girder carrying SR-405 WB over Fecrr in Brevard County, Florida. It was built in 1969, so it is 56 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,450 vehicles a day, roughly 8% of them trucks, projected to reach 11,191 by 2042. The structure is 189 ft (57.5 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-405 WB
CrossesFecrr
LocationSR-405 WB - Fecrr
RouteState Highway 405
StateFlorida
Coordinates28.52787, -80.79087
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.5 US tons
Inventory rating44.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length189 ft (57.5 m)
Longest span75 ft (22.9 m)
Deck width46 ft (14 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,450 (2023)
Projected traffic11,191 by 2042
Trucks8%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-405 WB over Fecrr built?

It was built in 1969, making it 56 years old in 2025.

What condition is SR-405 WB over Fecrr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR-405 WB over Fecrr carry?

About 6,450 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is SR-405 WB over Fecrr?

The structure is 189 ft (57.5 m) long with a longest span of 75 ft (22.9 m) and a deck 46 ft wide.

Who owns SR-405 WB over Fecrr?

It is owned by the State Highway Agency.