US Bridges

Holiday Inn Tunnel over CR 30

Good

Bay County, Florida · 1.1 Miles South of US98 · Structure no. 469006

Built
1989
36 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete Continuous
Length
34 ft
1 main span
Daily traffic
14,700
2015 count
Owner
Private
Private (other than railroad)

About this bridge

Holiday Inn Tunnel over CR 30 is a concrete continuous culvert carrying Holiday Inn Tunnel over CR 30 in Bay County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,700 vehicles a day, roughly 3% of them trucks, projected to reach 16,170 by 2035. The structure is 34 ft (10.5 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHoliday Inn Tunnel
CrossesCR 30
Location1.1 Miles South of US98
RouteCity Street 98A
StateFlorida
Coordinates30.18267, -85.81675
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.6 US tons
Inventory rating51.5 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length34 ft (10.5 m)
Longest span34 ft (10.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,700 (2015)
Projected traffic16,170 by 2035
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Holiday Inn Tunnel over CR 30 built?

It was built in 1989, making it 36 years old in 2025.

What condition is Holiday Inn Tunnel over CR 30 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Holiday Inn Tunnel over CR 30 carry?

About 14,700 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is Holiday Inn Tunnel over CR 30?

The structure is 34 ft (10.5 m) long with a longest span of 34 ft (10.5 m).

Who owns Holiday Inn Tunnel over CR 30?

It is owned by the Private (other than railroad).