US231 SR75 over Bear Creek
FairBay County, Florida · 0.9MI. North of SR20 · Structure no. 460083
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Concrete Continuous
- Length
- 105 ft
- 3 main spans
- Daily traffic
- 5,882
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US231 SR75 over Bear Creek is a concrete continuous slab carrying US231 SR75 over Bear Creek in Bay County, Florida. It was built in 1995, so it is 30 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,882 vehicles a day, roughly 12% of them trucks, projected to reach 10,204 by 2044. The structure is 105 ft (32 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US231 SR75 over Bear Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is US231 SR75 over Bear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does US231 SR75 over Bear Creek carry?
About 5,882 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is US231 SR75 over Bear Creek?
The structure is 105 ft (32 m) long with a longest span of 38 ft (11.7 m) and a deck 43 ft wide.
Who owns US231 SR75 over Bear Creek?
It is owned by the State Highway Agency.