US Bridges

No Data Entered over Little Suwanee Creek

PoorPosted for load

Baker County, Florida · No Data Entered · Structure no. 080504000015386

Built
1990
35 years old
Condition
Poor
inspected January 2024
Type
Slab
Concrete
Length
60 ft
4 main spans
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over Little Suwanee Creek is a concrete slab carrying No Data Entered over Little Suwanee Creek in Baker County, Florida. It was built in 1990, so it is 35 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 60 ft (18.3 m) long and 12 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesLittle Suwanee Creek
LocationNo Data Entered
RouteFederal Lands Road 291
StateFlorida
Coordinates30.56681, -82.56904
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating4 US tons
Inventory rating2.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadUnknown
Structure length60 ft (18.3 m)
Longest span15 ft (4.6 m)
Deck width12 ft (3.7 m)
Roadway width11 ft (3.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over Little Suwanee Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is No Data Entered over Little Suwanee Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2024.

How much traffic does No Data Entered over Little Suwanee Creek carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over Little Suwanee Creek?

The structure is 60 ft (18.3 m) long with a longest span of 15 ft (4.6 m) and a deck 12 ft wide.

Who owns No Data Entered over Little Suwanee Creek?

It is owned by the U.S. Forest Service.