US Bridges

SR-26 over US-301/CSXRR

Good

Alachua County, Florida · SR-26 / US-301& Csxrr · Structure no. 260114

Built
2009
16 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
278 ft
3 main spans
Daily traffic
12,000
2023 count
Owner
State
State Highway Agency

About this bridge

SR-26 over US-301/CSXRR is a prestressed concrete stringer/multi-beam or girder carrying SR-26 over US-301/CSXRR in Alachua County, Florida. It was built in 2009, so it is 16 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,000 vehicles a day, roughly 6% of them trucks, projected to reach 20,820 by 2045. The structure is 278 ft (84.7 m) long and 47 ft wide.

CarriesSR-26
CrossesUS-301/CSXRR
LocationSR-26 / US-301& Csxrr
RouteState Highway 26
StateFlorida
Coordinates29.71471, -82.1392
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.2 US tons
Inventory rating44.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length278 ft (84.7 m)
Longest span95 ft (29.1 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2023)
Projected traffic20,820 by 2045
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-26 over US-301/CSXRR built?

It was built in 2009, making it 16 years old in 2025.

What condition is SR-26 over US-301/CSXRR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR-26 over US-301/CSXRR carry?

About 12,000 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is SR-26 over US-301/CSXRR?

The structure is 278 ft (84.7 m) long with a longest span of 95 ft (29.1 m) and a deck 47 ft wide.

Who owns SR-26 over US-301/CSXRR?

It is owned by the State Highway Agency.