Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099
GoodNew Castle County, Delaware · Newport · Structure no. 1675 006
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected June 2021
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 260 ft
- 2 main spans
- Daily traffic
- 54,605
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099 is a steel continuous stringer/multi-beam or girder carrying Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099 in New Castle County, Delaware. It was built in 2017, so it is 8 years old, younger than the Delaware average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 54,605 vehicles a day, roughly 7% of them trucks, projected to reach 67,869 by 2042. The structure is 260 ft (79.2 m) long and 89 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099 built?
It was built in 2017, making it 8 years old in 2025.
What condition is Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2021.
How much traffic does Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099 carry?
About 54,605 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099?
The structure is 260 ft (79.2 m) long with a longest span of 130 ft (39.6 m) and a deck 89 ft wide.
Who owns Basin Rd/Sr 141 NB over I 95 & I 295 NB & 6099?
It is owned by the State Highway Agency.