Pow Mia Parkway over N/S RR & Puncheon Run
GoodKent County, Delaware · West Dover · Structure no. 2156S151
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected September 2021
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 732 ft
- 6 main spans
- Daily traffic
- 3,782
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Pow Mia Parkway over N/S RR & Puncheon Run is a prestressed concrete stringer/multi-beam or girder carrying Pow Mia Parkway over N/S RR & Puncheon Run in Kent County, Delaware. It was built in 2017, so it is 8 years old, younger than the Delaware average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,782 vehicles a day, roughly 7% of them trucks, projected to reach 9,860 by 2042. The structure is 732 ft (223.1 m) long and 39 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pow Mia Parkway over N/S RR & Puncheon Run built?
It was built in 2017, making it 8 years old in 2025.
What condition is Pow Mia Parkway over N/S RR & Puncheon Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2021.
How much traffic does Pow Mia Parkway over N/S RR & Puncheon Run carry?
About 3,782 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Pow Mia Parkway over N/S RR & Puncheon Run?
The structure is 732 ft (223.1 m) long with a longest span of 138 ft (42.1 m) and a deck 39 ft wide.
Who owns Pow Mia Parkway over N/S RR & Puncheon Run?
It is owned by the State Highway Agency.