Park Road N.W. over Piney Branch Pkwy
FairDistrict of Columbia, District of Columbia · Over Piney Branch Pkwy NW · Structure no. 0025
- Built
- 1959
- 66 years old, rebuilt 1999
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 329 ft
- 1 main span
- Daily traffic
- 6,000
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Park Road N.W. over Piney Branch Pkwy is a steel stringer/multi-beam or girder carrying Park Road N.W. over Piney Branch Pkwy in District of Columbia, District of Columbia. It was built in 1959 and reconstructed in 1999, so it is 66 years old, older than the District of Columbia average of 63.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,000 vehicles a day, roughly 1% of them trucks, projected to reach 13,500 by 2027. The structure is 329 ft (100.3 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Park Road N.W. over Piney Branch Pkwy built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1999.
What condition is Park Road N.W. over Piney Branch Pkwy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Park Road N.W. over Piney Branch Pkwy carry?
About 6,000 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Park Road N.W. over Piney Branch Pkwy?
The structure is 329 ft (100.3 m) long with a longest span of 206 ft (62.8 m) and a deck 55 ft wide.
Who owns Park Road N.W. over Piney Branch Pkwy?
It is owned by the State Highway Agency.