Leonard Road over Furnace Brook
GoodTolland County, Connecticut · 130 Ft from JCT Route 19 · Structure no. 04778
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 84 ft
- 1 main span
- Daily traffic
- 1,200
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Leonard Road over Furnace Brook is a prestressed concrete box beam or girders - multiple carrying Leonard Road over Furnace Brook in Tolland County, Connecticut. It was built in 2022, so it is 3 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,200 vehicles a day, roughly 5% of them trucks, projected to reach 1,783 by 2040. The structure is 84 ft (25.6 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Leonard Road over Furnace Brook built?
It was built in 2022, making it 3 years old in 2025.
What condition is Leonard Road over Furnace Brook in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Leonard Road over Furnace Brook carry?
About 1,200 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is Leonard Road over Furnace Brook?
The structure is 84 ft (25.6 m) long with a longest span of 82 ft (25 m) and a deck 31 ft wide.
Who owns Leonard Road over Furnace Brook?
It is owned by the Town or Township Highway Agency.