Route 2A over Massapeag Side RD
FairNew London County, Connecticut · 1.5 MI E of I-395 · Structure no. 03425
- Built
- 1967
- 58 years old, rebuilt 2008
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 27,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Route 2A over Massapeag Side RD is a prestressed concrete continuous stringer/multi-beam or girder carrying Route 2A over Massapeag Side RD in New London County, Connecticut. It was built in 1967 and reconstructed in 2008, so it is 58 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 27,000 vehicles a day, roughly 6% of them trucks, projected to reach 40,119 by 2040. The structure is 137 ft (41.8 m) long and 114 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 2A over Massapeag Side RD built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2008.
What condition is Route 2A over Massapeag Side RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Route 2A over Massapeag Side RD carry?
About 27,000 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is Route 2A over Massapeag Side RD?
The structure is 137 ft (41.8 m) long with a longest span of 64 ft (19.5 m) and a deck 114 ft wide.
Who owns Route 2A over Massapeag Side RD?
It is owned by the State Highway Agency.